Project Details

  • Construction Date

    2020

  • Location

    Eger

  • Surface Area

    3000

  • Construction Investor

    Dynamik Út Kft.

  • Categories:

Project Description

We built this 3000 sqm logistics hall for the Bosch group in Hungary. The frame structure is concrete, the floor size 50 m x 60 m. the construction time was 7 monthes. We are happy to cooperate with our client. Thank you for the assignement.